Roof Replacement Near You With a Full Tear-Off, Decking Repairs and a New Atlas Roof Installed in One Day
Charleston Roofs and Windows Runs Every Replacement With a W2 Project Manager, a Clean Job Site and a Final Walkaround
Your old roof comes off at 7 a.m. Your new one is on, and the yard is clean, by late afternoon. That's a normal install day with Charleston Roofs and Windows, and it's why homeowners keep writing "done in one day" in our reviews.
Every layer is new: decking repairs, underlayment, drip edge, flashing, shingles, ridge and vents. We're the only Atlas Pro+ Diamond contractor in our service area. Free estimates. 0% financing for 12 months.
- Atlas Pro+ Diamond Level
- Viwinco Blue Label
- BBB A+ Accredited
- 4.9 Stars, 680 Google Reviews
- 0% Financing for 12 Months
Contact Us
We will get back to you as soon as possible.
Please try again later.
How to Choose a Roof Replacement Company Near You That Won't Sell You More Roof Than You Need
Choosing a roof replacement company near you starts with one test: does the roofer tell you when you don't need a new roof yet? Charleston Roofs and Windows quotes repairs when a repair will do the job, and replacement when it won't.
"Eric was great and professional without being pushy. They were willing to do repairs on our roof when several other companies were pushing only a new roof option. He quoted us for the repair and a replacement."
Andrew Mahoney, 5 stars, Google (read this review on Google)
Three Questions to Ask Before You Sign a Roof Replacement Contract
Will You Tear Off the Old Roof or Lay New Shingles Over It?
Some roofers quote an overlay because it's cheaper to bid, then you find out later that soft decking was buried under the new shingles. You want the method spelled out in writing.
How Charleston Roofs and Windows Answers
Charleston Roofs and Windows recommends a full tear-off on almost every home. We only consider an overlay when the roof has one layer, the decking is solid and nothing is sagging, and we put the method on your estimate.
What Exactly Is Included Besides the Shingles?
Two quotes can name the same shingle and still be thousands apart. The gap is usually underlayment, flashing, ventilation and decking.
How Charleston Roofs and Windows Answers
Your written estimate lists every component of the system, not just a shingle name and a square count. Our installs are built around the Atlas Signature Select system.
● Atlas Pro+ Diamond Level
Diamond is the top reward tier in the Atlas PRO+ program, earned by installing Signature Select systems and Atlas shingles with Scotchgard Protector. Charleston Roofs and Windows is the only Diamond contractor in our service area.
Who Supervises the Crew on Install Day?
A roof replacement happens fast. If no one from the company is on site, nobody catches a missed flashing detail before the shingles cover it.
How Charleston Roofs and Windows Answers
A W2 project manager checks the crew during the install and walks the finished roof with you. Project managers like Jared Purcell, Adam and Luis show up in our reviews by name.
● Final Walkaround on Every Roof
Before the job closes, your project manager walks the house with you, shows you the work and confirms the cleanup.

- Shingle surface
- Decking and attic
- Repair history
Signs It's Time for a Roof Replacement Instead of Another Repair
A roof replacement is the right call when the roof's materials are worn out across the whole surface, not just in one spot. Charleston Roofs and Windows looks at the roof and the attic together before calling it, because many of these signs show up inside first.
Seven Signs Your Roof Is Done
- 01 Age. Asphalt shingle roofs past 20 years are near the end in Lowcountry heat and humidity.
- 02 Granules in the gutters. Shingles shed their protective granules as the asphalt breaks down.
- 03 Sagging shingle lines. A wavy roofline usually means the decking underneath is soft or rotting.
- 04 Daylight in the attic. If light gets in through the boards, water can too.
- 05 Leaks in more than one place. Several leaks mean a failing roof, not a bad spot.
- 06 Widespread cracked, curled or missing shingles. One or two can be patched. Whole slopes can't.
- 07 A patchwork of mismatched repairs. Buyers notice, and each patch is another seam for water.
When a Repair Still Makes Sense
A younger roof with one leak at a pipe boot, chimney or valley is a repair job. Charleston Roofs and Windows will quote you both options side by side when the call is close, so you can decide with the numbers in front of you.
"The Charleston Roofs and Windows team did an amazing job on our roof replacement! We called them out for a roof leak and they had the whole roof done three days later!"
Full Tear-Off vs. Reroofing Overlay: Which One Your Roof Needs
A full tear-off removes every shingle and the old underlayment down to the wood deck, while a reroofing overlay nails a new layer of shingles on top of the existing roof. Charleston Roofs and Windows does both, but an overlay only fits a narrow set of roofs.
- What happens Old shingles and underlayment removed to the deck
- Decking check Every sheet is visible and soft wood gets replaced
- New underlayment and flashing Yes, full deck coverage
- Roof weight One layer
- Upfront cost Higher
- Install time Usually one day
- Best for Most Lowcountry homes, any roof with soft spots or prior overlays
- What happens New shingles nailed over the existing layer
- Decking check Decking stays hidden under the old roof
- New underlayment and flashing Limited, old layer stays in place
- Roof weight Two layers on the framing
- Upfront cost Lower
- Install time Usually one day
- Best for A single-layer roof with a solid, flat deck and minor surface wear
When Charleston Roofs and Windows Recommends Against an Overlay
We will steer you away from an overlay, even though it's the cheaper bid, when we find any of these:
- The roof has already been reroofed once. A third layer adds weight the framing wasn't built to carry.
- Shingles are badly damaged, sagging or rotting. They can't support a new layer.
- Lots of shingles are missing. The base is too uneven to nail a new roof over.
- The decking is soft or water-damaged. New shingles over bad wood just hide the problem.
What the Building Code Says
The residential building code used in South Carolina does not allow a roof recover over a covering that is water-soaked or too deteriorated to serve as a base. It also bars a recover when the roof already has two or more layers, or when the existing roof is slate or tile.

- Every deck sheet
- New underlayment
- New flashing
What Goes Into a Full Roof Replacement System
A full roof replacement system is every layer between your attic and the sky, from the wood deck up to the ridge vent. Charleston Roofs and Windows replaces all of it, because a new shingle on top of old flashing or tired underlayment is still a weak roof.
- 01
Decking
The plywood or board base everything nails into
Why it matters here Humidity and old leaks rot sheathing, and soft wood won't hold nails in high wind
- 02
Self-adhesive underlayment
Seals eaves, valleys and penetrations
Why it matters here Backup protection where wind-driven rain gets under shingles
- 03
Synthetic underlayment
Covers the rest of the deck
Why it matters here Keeps the deck dry during install and behind the shingles for the life of the roof
- 04
Drip edge
Metal edge at eaves and rakes
Why it matters here Sends water into the gutter instead of behind the fascia
- 05
Flashing
Metal at walls, chimneys, valleys and roof penetrations
Why it matters here Where most leaks start, so it gets replaced, not reused
- 06
Starter shingles
Sealed first course at the edges
Why it matters here Anchors the edge where wind uplift starts
- 07
Field shingles
The roof you see
Why it matters here Color, wind rating and algae resistance
- 08
Hip and ridge caps
Cover the peaks
Why it matters here Finish the roof and protect the ridge vent
- 09
Ventilation
Ridge and intake vents
Why it matters here Moves attic heat and moisture out to protect the deck and shingles
The Atlas Signature Select Roofing System
Atlas Signature Select is a matched roofing system where every major component comes from Atlas. Charleston Roofs and Windows installs it so your roof is backed as a system, not as a stack of parts from different brands.
What's in the System
- WeatherMaster self-adhesive underlayment.
SBS-modified asphalt for secondary waterproofing at critical areas.
- Summit synthetic underlayment.
A woven, tear-resistant sheet for the rest of the deck.
- Pro-Cut HP42 starter shingles.
Protect the roof edge and add anchoring for high wind.
- Atlas shingles.
Lines like Pinnacle Pristine, StormMaster Shake and ProLam.
- Atlas hip and ridge shingles.
Including options with Scotchgard Protector.
- Atlas ventilation.
Ridge vents and other exhaust options matched to the attic.
Why a System Beats a Shingle
Atlas says installing a Signature Select system extends the premium protection period on your warranty compared with shingles alone. Your Charleston Roofs and Windows inspection manager will show you the warranty terms for the exact shingle you pick before you sign.
"My new roof is so beautiful and I'm at ease knowing they back their workmanship and materials with a terrific warranty."
Decking Surprises and How We Handle Them
Nobody can see every sheet of decking until the old roof is off. Charleston Roofs and Windows explains how decking replacement is priced on your estimate, and your project manager tells you what the crew finds the same day.
"When there were unforeseen issues, they clearly laid out all my options."
Your Roof Replacement Install Day, Hour by Hour
A roof replacement install day is one long, planned shift that starts with tarps and ends with a magnet sweep. Here is how a typical Charleston Roofs and Windows replacement runs on a single-family home.
- Day before
Shingles and materials are delivered to your driveway
- About 7:00 a.m.
Crew arrives, covers plants, shrubs and the driveway
- Morning
Tear-off down to the deck, with debris cleared as the crew works
- About 8:00 a.m.
Your project manager checks in on site
- Late morning
Soft or rotten decking replaced, then underlayment and drip edge go on
- Midday into afternoon
Flashing, starter, shingles, ridge caps and ventilation installed
- About 4:00 p.m.
Cleanup, magnet sweep and final walkaround with your project manager

"The day of the install the crew showed up at 7am started covering up the plants and then removing the old roofing. Jered the project manager showed around 8am making sure all was well."
What Can Push Your Roof Into a Second Day
Most Charleston Roofs and Windows replacements finish in one day. Steep pitches, many valleys, large square footage, heavy decking replacement or afternoon storms can stretch a job to two days, and we'll tell you up front if your roof is likely to.
Cleanup You Won't Have to Redo
Cleanup comes up in 119 Google reviews of Charleston Roofs and Windows. Crews cover landscaping before tear-off, haul debris the same day and run magnets across the yard and driveway for nails.
"Louis and his crew did an excellent job of installing my new roof. Very professional answering all my questions and explaining why and how any work would be done if it was necessary. Their clean up was like they were never there."

- Shingle
- Metal
- Flat and low-slope
Roof Replacement Material Options for Lowcountry Homes
Your roof replacement material decides how long the new roof lasts, how it handles wind and what it costs. Charleston Roofs and Windows installs shingle, metal and low-slope systems, and your inspection manager will tell you which one fits your house and budget.
- 01 Architectural asphalt shingles.
The most common Lowcountry replacement, with Atlas Scotchgard Protector against algae streaks.
- 02 Standing seam or exposed fastener metal.
A longer lifespan and strong wind performance for coastal homes.
- 03 FORTIFIED roof upgrade.
Sealed deck and reinforced edges added during replacement.
- 04 Flat and low-slope membranes.
TPO and modified systems for porches, additions and low-slope sections.
Your Roof Replacement in Five Steps From First Call to Final Walkaround
Charleston Roofs and Windows runs every roof replacement the same way, so you always know what comes next.
Free inspection
An inspection manager checks the roof and attic and photographs what he finds.
Written estimate
You get a line-by-line scope, the shingle line, a decking plan and financing options, often on the same visit.
Color and material selection
Pick your shingle color, then your project manager confirms materials and your install date.
Install day
Tear-off, decking, underlayment, flashing, shingles, ridge and vents, usually in one day.
Final walkaround
Your project manager walks the roof and yard with you and confirms cleanup before closing the job.
"Eric Chesnutt was my sales contact. He was very helpful in recommending the right shingles and completed an estimate the same visit and on site. He was able to get the job scheduled on the date of my choice same visit as well. The job was completed in one day."
Paul Hasemeyer, 5 stars, Google ( read this review on Google)What Roof Replacement Costs Near You and How to Pay for It
A full architectural shingle roof replacement on a typical 1,800 to 2,200 square foot Lowcountry home runs about $11,500 to $17,000 in 2026. Charleston Roofs and Windows gives you an exact written price after a free inspection.
Standing seam metal on the same size home runs about $18,000 to $28,000. Installed pricing for architectural shingles in the area runs about $4.85 to $8.65 per square foot, including tear-off, permits and disposal.
Per square foot Architectural shingles run about $4.85 to $8.65 installed, including tear-off, permits and disposal.
What Moves the Price of a New Roof
- Roof size and pitch.
Steep roofs need more safety setup and more labor hours.
- Complexity.
Valleys, dormers and multiple roof planes can add $1,500 to $4,000.
- Decking replacement.
Confirmed once the old roof is off and the crew can see every sheet.
- Shingle line.
Designer and impact-rated shingles cost more than standard architectural.
- Layers to remove.
A roof with an old overlay takes longer to tear off.
- Ventilation upgrades.
Adding ridge or intake venting the old roof never had.
"Wonderful communication, & they quoted a very fair estimate for a full roof replacement. They came out today and installed the roof in just one day!"
Financing, Specials and Referral Rewards
- 0% for 12 months
0% interest for 12 months on approved credit through Service Finance Company, with fast credit decisions.
- Replacement specials
New roof replacement specials on retail projects. Present the offer at your first appointment.
- Veteran and first responder
Veteran and first responder specials, one per household, not combinable with other offers.
- $250 referral reward
$250 referral reward when someone you send completes a project with Charleston Roofs and Windows.
More Roofing Services From Charleston Roofs and Windows
Charleston Roofs and Windows handles every roofing job under one office team and one set of W2 project managers.
All Roofing Services
Everything our roofing team does.
Shingle Roofing
Atlas architectural and designer shingles with Scotchgard Protector.
Roof Repair
Leaks, flashing, valleys and missing shingles.
Roof Inspection
Free inspections with photos and a plain-language report.
Metal Roofing
Standing seam and exposed fastener systems.
FORTIFIED Roofing
Hurricane-resistant upgrades built into your replacement.
Storm Damage Repair
Same-day tarping and wind, hail and hurricane repairs.

Frequently Asked Questions
Most residential roof replacements take one day. Charleston Roofs and Windows crews usually arrive around 7 a.m. and finish cleanup by late afternoon. Steep, cut-up or very large roofs, or heavy decking replacement, can take two days.
Sometimes, but rarely. Charleston Roofs and Windows only considers an overlay on a single-layer roof with solid decking and no sagging. If the roof was already reroofed, has soft wood or many missing shingles, we recommend a full tear-off.
An architectural shingle replacement on a typical 1,800 to 2,200 square foot Lowcountry home runs about $11,500 to $17,000 in 2026. Charleston Roofs and Windows gives you a written price after a free inspection, with 0% financing for 12 months on approved credit.
Yes. Once the old roof is off, the crew checks every sheet and replaces soft or rotten decking before underlayment goes down. Charleston Roofs and Windows explains decking pricing on your estimate and your project manager tells you what was found.
It's a matched system of Atlas underlayment, starter, shingles, hip and ridge caps and ventilation. Charleston Roofs and Windows installs it so your roof is warranted as a system, which Atlas says extends the premium protection period over shingles alone.
No, but it helps to be reachable. Move cars out of the driveway the night before, and plan a few minutes with your Charleston Roofs and Windows project manager for the final walkaround.
Age, granule loss, sagging, daylight in the attic and leaks in several spots point to replacement. A younger roof with one leak usually needs a repair. Charleston Roofs and Windows quotes both when the call is close.
Debris is hauled away the same day. Before the crew leaves, the Charleston Roofs and Windows crew sweeps the yard, driveway and beds with magnets, and your project manager checks the cleanup with you.
How to Reach Charleston Roofs and Windows and Where to Find Us
Charleston Roofs and Windows gets an inspection manager to your home fast, usually within a day or two, and most replacement estimates are written on that first visit.
Call Us
Talk to the Charleston Roofs and Windows office team at 843-955-8558. Tell them how old your roof is and we'll book your free replacement inspection on the first call.
843-955-8558 →Book Online
Fill out the free inspection form with your name, phone and address. Our office team calls you back to confirm a time.
Visit Our Office
Charleston Roofs and Windows 9565 William Aiken Ave Ste 102Ladson, SC 29456
843-955-8558 Get Directions ↗
What Happens After You Reach Out
We call you back to confirm a time that works for you.
An inspection manager visits, checks the roof and attic, and photographs what he finds.
You get a written estimate with every layer of the system listed and financing options.
You decide. No pressure, no "today only" pricing.
Our Roof Replacement Service Areas
Charleston Roofs and Windows provides roof replacement across 20 communities in Charleston, Berkeley and Dorchester counties. Island homes take salt air and the full force of tropical storms, while inland roofs fight humidity, shade and pine straw that hold moisture against the deck.
Charleston Roofs and Windows in Charleston, SC
Charleston Roofs and Windows in Charleston, SC handles roof replacement for every community in the table below. One office team, W2 project managers on every install, and the same final walkaround whether you live on Kiawah or in Goose Creek.
Communities We Serve
20 Service Locations| Community | County | Approx. Distance (Miles) |
|---|---|---|
| Charleston (downtown) | Charleston | 0 |
| West Ashley | Charleston | 5 |
| James Island | Charleston | 5 |
| Mount Pleasant | Charleston | 6 |
| Sullivan's Island | Charleston | 8 |
| North Charleston | Charleston | 9 |
| Daniel Island | Berkeley | 9 |
| Johns Island | Charleston | 10 |
| Folly Beach | Charleston | 10 |
| Hanahan | Berkeley | 11 |
| Isle of Palms | Charleston | 12 |
| Wadmalaw Island | Charleston | 15 |
| Ladson | Berkeley / Dorchester | 16 |
| Goose Creek | Berkeley | 17 |
| Wando | Berkeley | 17 |
| Kiawah Island | Charleston | 17 |
| Ravenel | Charleston | 18 |
| Hollywood | Charleston | 18 |
| Lincolnville | Charleston / Dorchester | 19 |
| Summerville | Dorchester | 20 (south side), about 22 to town center |
Replace Your Roof in One Day With the Area's Only Atlas Pro+ Diamond Contractor
A new roof should be done right once. Book a free roof replacement inspection with Charleston Roofs and Windows, get a written estimate that lists every layer, and let a W2 project manager run your install from tear-off to the final walkaround.



